What is the difference between a negotiated price bidding process and a low-bid bidding process? In a negotiated price process, the price is set and the first contractor to bid for the work gets the job, but in a low-bid process, the
contractor with the lowest bid wins.
O
In a negotiated price process, the contractor that can show the best qualifications wins, but in a low-bid process, the contractor with the
lowest bid in terms of price wins.
In a negotiated price process, the price is flexible, but in a low-bid process, bidding continues until a bidding contractor bids low enough to
reach a set price for the project.
O In a negotiated price process, the projects are large, but in a low-bid process, the projects are small with smaller budgets,

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
A2-m rigid tank initially contains saturated water vapor at 100 kpa. the tank is connected to a supply line through a valve. steam is flowing in the supply line at 600 kpa and 300 c. the valve is opened, and steam is allowed to enter the tank until the pressure in the tank reaches the line pressure, at which point the valve is closed. a thermometer placed in the tank indicates that the temperature at the final state is 200°c. determine (a) the mass of steam that has entered the tank (b) the amount of heat transfer.
Answers: 3
You know the right answer?
What is the difference between a negotiated price bidding process and a low-bid bidding process? In...
Questions
question
Mathematics, 10.10.2019 20:30
question
Mathematics, 10.10.2019 20:30
Questions on the website: 13722361