subject
Engineering, 19.11.2020 19:00 ctyrector

A piping system is to conduct water at 20oC at a flowrate of 0.1 m3 /s from a location where the pressure is 8 bars to a location where the pressure must be at least 5 bars. The total length of piping is 91.4 m, the installation requires four 90o elbows, and there is no significant change in elevation. What standard-sized Schedule 40 commercial steel pipe should be installed?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 19:10
Which of the following is the most important advantage of a large field of view? a. allows larger areas to be examined b. relieves eyestrain c. minimizes parallax errors. d. increases precision in proportion to the in- crease in field of view
Answers: 2
question
Engineering, 04.07.2019 19:10
Ahelical coil spring has a mean diameter of 50 mm, a wire diameter of 5.5 mm and is wound with a pitch of 10 mm. the spring steel has an ultimate strength of 1250 mpa. find the force needed to compress the spring solid and the wire stress in this condition. state whether the spring will return to its initial length.
Answers: 1
You know the right answer?
A piping system is to conduct water at 20oC at a flowrate of 0.1 m3 /s from a location where the pre...
Questions
question
Mathematics, 04.03.2020 01:35
Questions on the website: 13722362