Engineering, 17.11.2020 21:10 meramera50

Two employees were installing aluminum siding on a farmhouse when it became necessary to remove a 36-foot high metal pole CB antenna. One employee stood
on a metal pick board between two ladders and unfastened the antenna at the top
of the house. The other employee, who was standing on the ground, took the
antenna to lay it down in the yard. The antenna made electrical contact with a
7200-volt power transmission line 30 feet 10 inches from the house and 23 feet 9
inches above the ground. The employee handling the antenna received a fatal
shock and the other employee a minor shock. What precautions might have
prevented this accident?
Select the 4 answer options that apply.

1) Ensure you have training on the hazards of working close to power lines.

2) another worker should have help with carrying the antenna.

3) Guard all electrical power circuits against accidental contact by insulating the circuit or de-energizing it.

4) The metal pick board shouldn’t have been used.

5) Do not work near any part of an electrical power circuit which might be contacted in the course of the work.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
You know the right answer?
Two employees were installing aluminum siding on a farmhouse when it became necessary to remove a 3...
Questions
Questions on the website: 13722363