A water treatment plant is designed to process 100 ML/d (mega liter per day). The flocculator is 30 m long, 15 m wide, and 5 m deep. Revolving paddles are attached to four horizontal shafts that rotate at 1.5 rpm. Each shaft supports four paddles that are 200 mm wide, 15 m long and centered 2 m from the shaft. Assume the mean water velocity to be 70% less than paddle velocity and CD = 1.8. all paddles remain submerged all the time. Calculate the following:

a. Difference in velocity between paddles and water
b. Value of G
c. Retention time

d. Camp number.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
You know the right answer?
A water treatment plant is designed to process 100 ML/d (mega liter per day). The flocculator is 30...
Questions
question
Social Studies, 13.10.2020 14:01
question
Advanced Placement (AP), 13.10.2020 14:01
question
English, 13.10.2020 14:01
Questions on the website: 13722367