subject
Engineering, 16.11.2020 16:40 briannabarreraswestb

A 4-ft-diameter finished-concrete sewer pipe is half full of water. (a) Estimate the speed of propagation of a small-amplitude wave propagating along the channel. (b) If the water is flowing at 14,000 gal/min, calculate the Froude number. (c) Calculate the critical slope and (d) the actual slope if the uniform flow rate is 14,000 gal/min.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
You know the right answer?
A 4-ft-diameter finished-concrete sewer pipe is half full of water. (a) Estimate the speed of propag...
Questions
question
Biology, 05.01.2021 18:30
question
Mathematics, 05.01.2021 18:30
question
Mathematics, 05.01.2021 18:30
Questions on the website: 13722361