subject
Engineering, 09.11.2020 04:30 tamikalove78

In the XYZ Company's automatic screw machine department, five machines are assigned to each operator. On a given job, the machining time per piece is 0.164 hours and the machine servicing time is 0.098 hours. With an operator rate of $12.80 per hour and a machine rate of $14 per hour, calculate the expected cost per unit of output.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
You know the right answer?
In the XYZ Company's automatic screw machine department, five machines are assigned to each operator...
Questions
question
History, 26.08.2020 18:01
question
Mathematics, 26.08.2020 18:01
question
History, 26.08.2020 18:01
Questions on the website: 13722367