Which of the following approaches to lean engineering consists of teams of people from different departments sharing information about a manufacturing process?
Integrated product and process development (IPPD)
Value stream mapping (VSM)
O Plan-do-study-act (PDSA)
O Design for manufacturing and assembly (DFMA)

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12ยฐ, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
question
Engineering, 04.07.2019 19:10
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
You know the right answer?
Which of the following approaches to lean engineering consists of teams of people from different dep...
Questions
question
Biology, 31.01.2022 14:00
question
Mathematics, 31.01.2022 14:00
question
Mathematics, 31.01.2022 14:00
question
Mathematics, 31.01.2022 14:00
Questions on the website: 13722367