subject
Engineering, 19.10.2020 18:01 cdyshaylia55

An HVAC business owner estimates that if she sends out her winter gold star service advertisement flyer in mid October before her competition, she will book a total of 1000 appointments, at $300 each. Although, she thinks that by timing her flyer release closer to cooler weather, she will increase her appointments by 120 each week she delays the release. However, the price will likely need to drop at a rate of $15 per appointment per week due to increased competition as the weather turns colder. In addition, she estimates that she will lose approximately 20 appointments per week she delays due to cancelations. Her timeframe for releasing the flyer over the next six weeks. 1. Write an equation to determine what week out of the six week period she should release her flyer for the largest total cash return? (Hint: Releasing the flyer with no delay would be considered "Week 0" with a $300,000 return)
2. How much will she receive for her service appointments at that time?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 05.07.2019 23:20
Which one of the following faults cause the coffee in a brewer to keep boiling after the brewing cycle is finished? a. an open circuit in the heating element b. a short circuit at the terminals c. welded contacts on the thermostat d. a leak around the gasket
Answers: 3
You know the right answer?
An HVAC business owner estimates that if she sends out her winter gold star service advertisement fl...
Questions
question
English, 06.10.2020 04:01
question
Mathematics, 06.10.2020 04:01
Questions on the website: 13722361