subject
Engineering, 18.10.2020 15:01 ItzAquaZ1449

This is the text--->Li Construction has been hired to begin demolition on a 46-story, high-rise office building in a dense urban district. Specifically, the company will be conducting a green demolition in which as many construction and demolition materials will be recovered as possible. This is what I'm trying to figure out--->Describe the process by which the company will prepare for the demolition, including how and in what order the company will incorporate structural and nonstructural deconstruction, a deconstruction survey, hazardous waste disposal, and techniques such as undermining and implosion to successfully complete the green demolition. Be sure to note the purpose of each stage and how Li Construction can ensure it uses environmentally friendly and sustainable practices at each stage in order to meet the project goals.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 19:10
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
question
Engineering, 04.07.2019 19:20
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
You know the right answer?
This is the text--->Li Construction has been hired to begin demolition on a 46-story, high-rise o...
Questions
question
Mathematics, 02.06.2020 05:57
question
Mathematics, 02.06.2020 05:57
question
Mathematics, 02.06.2020 05:57
question
Mathematics, 02.06.2020 05:58
question
Mathematics, 02.06.2020 05:58
question
Mathematics, 02.06.2020 05:58
Questions on the website: 13722363