subject
Engineering, 05.10.2020 16:01 Auriieee

According to the EWR specifications, ___ is responsible for picking up and disposing of debris or rubbish from equipment installed by the electrical contractor on the project.
Select one:
a. The general contractor
b. Contracted laborers
c. The electrical contractor
d. none of these

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
According to the EWR specifications, ___ is responsible for picking up and disposing of debris or ru...
Questions
question
World Languages, 19.04.2021 19:10
question
Mathematics, 19.04.2021 19:10
question
Computers and Technology, 19.04.2021 19:10
question
Mathematics, 19.04.2021 19:10
Questions on the website: 13722360