Engineering, 08.09.2020 14:01 victoriay3
Following lockout/tagout (LOTO) procedures is important but not required when working with dangerous
machines.
a) true
b) false
Answers: 2
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
Following lockout/tagout (LOTO) procedures is important but not required when working with dangerous...
Mathematics, 12.07.2019 02:00
Business, 12.07.2019 02:00
Chemistry, 12.07.2019 02:00
Geography, 12.07.2019 02:00
Advanced Placement (AP), 12.07.2019 02:00
Spanish, 12.07.2019 02:00
Health, 12.07.2019 02:00
Mathematics, 12.07.2019 02:00
Biology, 12.07.2019 02:00