A small-scale wind turbine with the rotor diameter 1.5m uses a 500-Watt DC motor as a generator. Find the capacity factor for the machine if it delivers 100 kWh in a 30-day month. Under the standard condition of 15C temperature and 1 atm pressure, how fast would the wind have to blow for the turbine to generate half of its rate power if the machine is 30% efficient at that point

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
You know the right answer?
A small-scale wind turbine with the rotor diameter 1.5m uses a 500-Watt DC motor as a generator. Fin...
Questions
question
Mathematics, 20.09.2021 14:00
question
English, 20.09.2021 14:00
question
Mathematics, 20.09.2021 14:00
question
History, 20.09.2021 14:00
question
Mathematics, 20.09.2021 14:00
question
Mathematics, 20.09.2021 14:00
Questions on the website: 13722363