Question 9.1 from the textbook. Consider the following workload: Process Burst Time Priority Arrival Time P1 50 4 0 P2 20 1 20 P3 100 3 40 P4 40 2 60 Show the schedule using shortest remaining time, non-preemptive priority (a smaller number implies higher priority) and round robin with quantum 30, Make each entry in your answer equal to 10 time units. For example if your algorithm was FCFS then your answer would be: P1 P1 P1 P1 P1 P2 P2 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P4 P4 P4 P4

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
question
Engineering, 04.07.2019 19:10
Air inially occupying a volume of 1 m2 at 100 kpa, 27 c undergoes three internally reversible processes in series. process 1-2 compression to 500 kpa during which pv constant process 2-3 adiabatic expanslon to 100 kpa process 3-1: constant-pressure expansion to 100 kpa (a) calculate the change of entropy for each of the three processes. (b) calculate the heat and work involved in each process. (c) is this cycle a power cycle or refrigeration cycle?
Answers: 3
question
Engineering, 06.07.2019 03:10
Different between boring and turning?
Answers: 1
You know the right answer?
Question 9.1 from the textbook. Consider the following workload: Process Burst Time Priority Arrival...
Questions
question
English, 11.04.2021 21:40
question
Mathematics, 11.04.2021 21:40
Questions on the website: 13722363