subject
Engineering, 06.05.2020 07:25 Queenjlife2583

Scaffolding is to be constructed on all faces of a six-story building in order for major masonry rehabilitation work to be performed. The exposed surface area of the exterior walls of the building has been estimated to be 432,000 sq. ft. Historical records of the company show that for this simple type of structure, the production rate for erecting scaffolding is 0.002 hours per square foot of building surface area. If 10 workers (working 8-hour days) are assigned to do the entire scaffolding erection, what duration (in working days) should be used for this activity? Round up your answer to the nearest whole integer day.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
You know the right answer?
Scaffolding is to be constructed on all faces of a six-story building in order for major masonry reh...
Questions
Questions on the website: 13722363