subject
Engineering, 21.04.2020 17:32 COOLIOMARIS

The Oo Task Selection Algorithm is a greedy algorithm that at each step, selects the task that overlaps with the fewest other tasks. Show that this algorithm does not always produce an optimal schedule of tasks. Reminder: The Optimal Task Selection Algorithm selects tasks by the earliest end date. Hint: Come up with a schedule of talks such that the unoptimal schedule would start by selecting a talk in the middle of the day rather than at the end of the day.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
You know the right answer?
The Oo Task Selection Algorithm is a greedy algorithm that at each step, selects the task that overl...
Questions
question
Physics, 15.04.2021 16:10
question
Mathematics, 15.04.2021 16:10
question
English, 15.04.2021 16:10
question
English, 15.04.2021 16:10
Questions on the website: 13722367