Engineering, 16.04.2020 01:10 weridness80
As a materials engineer in charge of designing concrete mix and facing the following problems, which admixture would you use in each case during mixing or at the jobsite? a. There is a large quantity of freshly mixed concrete and the work at the job-site had to stop because of rain. b. More time is expected to be needed for finishing concrete. c. The structure is subject to freezing. d. Concrete is to be around tightly spaced reinforcing steel. e. Concrete mix will be hauled a long distance. f. High early strength concrete is required, but not necessarily high ultimate strength.
Answers: 3
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
Engineering, 04.07.2019 19:20
Amass-spring-viscous damper system of mass 3 kg has a frequency of 100 rad/s and is critically damped. its initial conditions are x(0)-3 mm and (0)-2.3 m/s. does the system overshoot its equilibrium position? prove your answer
Answers: 1
Engineering, 06.07.2019 03:20
What is the maximum height from which a mass of 30 kg can fall on to a flange on the lower end of a vertical rod of length 1.0 m and diameter 20 mm, the upper end being rigidly fixed, if the stress in the rod is not to exceed 80 mpa? the tensile modulus of the rod is 200 gpa.
Answers: 3
Engineering, 06.07.2019 03:30
Give three differences between corrosion of metals and the corrosion of ceramics? what is static fatigue?
Answers: 1
As a materials engineer in charge of designing concrete mix and facing the following problems, which...
Mathematics, 17.04.2021 04:40
Mathematics, 17.04.2021 04:40
Mathematics, 17.04.2021 04:40
Mathematics, 17.04.2021 04:40
History, 17.04.2021 04:40
English, 17.04.2021 04:40
Mathematics, 17.04.2021 04:40
Geography, 17.04.2021 04:40