subject
Engineering, 15.04.2020 17:43 Gerber7778

An excavation project uses a pump rated at 450 gallons per minute for the removal of water. The pump is located 15 ft above the bottom of the hole and discharges to a level thats 35 feet above the pump. The four inch diameter suction hose measures 50 feet long. The discharge line also a four inch hose is 150 long. What is the total head development?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 19:20
To save energy, the air supply to a 2000 ft office has been shut off overnight and the room temperature has dropped to 40°f. in the morning, the thermostat is reset to 70°f and warm air at 120 f begins to flov in at 200ft'/min. the air is well mixed within the room, and an equal mass flow of air at room temperature (changing with time) is withdrawn through a return duct. the air pressure is nearly 1 atm everywhere. ignoring heat transfer with the surroundings and kinetic and potential energy effects, estimate how long it takes for the room temperature to reach 70°f. plot the room temperature as a function of time.
Answers: 1
question
Engineering, 04.07.2019 19:20
A21-tooth spur pinion mates with a 28-tooth gear. the diametral pitch is 3 teeth/in and the pressure angle is 20°, find the following values: the addendum, dedendum, circular pitch, tooth thickness, and base circle diameters.
Answers: 2
You know the right answer?
An excavation project uses a pump rated at 450 gallons per minute for the removal of water. The pump...
Questions
question
Mathematics, 06.11.2019 23:31
question
English, 06.11.2019 23:31
Questions on the website: 13722365