subject
Engineering, 14.04.2020 21:38 edamite12

Consider a group of 20 workers and a set of 40 tasks. Every worker can do 6 different tasks, and every task can be done by 3 different workers. Show that one can assign each task to a worker who can do it in such a way that every worker gets two tasks.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
You know the right answer?
Consider a group of 20 workers and a set of 40 tasks. Every worker can do 6 different tasks, and eve...
Questions
Questions on the website: 13722367