subject
Engineering, 10.04.2020 04:59 evelyngarcia99

Things never seem to slow down, particularly on your existing subsea project. While all this activity is going on with the new oil zones, you and your team have to keep up with the design, procurement, fabrication, testing and installation scope for the rest of the subsea project. Things never seem to slow down, particularly on your existing subsea project. While all this activity is going on with the new oil zones, SIT issues, you and your team have to keep up with the design, procurement, fabrication, testing and installation scope for the rest of the subsea project. The latest problem involves the subsea connectors used throughout your project. Before you hired on, decisions were made to use an older model so-called legacy connection system, which had been used successfully in the past in this area by your company. This particular connection system had not been used in a long time by anyone, and although this connection system load capacities were known, there has been a change to the API Standards that require connector load capacities be re-calculated using different methods and factors. And while your new order for the old design connection system was progressing for your project, the revised design calculations were made, and they are sitting on your desk for review. As your luck would have it, to general surprise the calculations using the current methods proved the connector load capacities to be much smaller than previously shown in the legacy project documentation, which was all that your company had when the decision was made to use this system. Changing the connector system to a different design is a last resort, as it would delay the project by more than a year. You have been asked to investigate this and recommend an action plan. What are the minimum ten key concerns here, and what are your recommendations for how to approach this?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
question
Engineering, 04.07.2019 19:10
Arigid tank contains 10 kg of air at 137 kpa (abs) and 21°c. more air is added to the tank until the pressure and temperature rise to 242 kpa (abs) and 32°c, respectively. determine the amount of air added to the tank. [r-0.287 kj/kg k]
Answers: 3
question
Engineering, 04.07.2019 19:20
Aseries piping system conveys methyl alcohol. the system consists of 70 m of 1- nominal pipe follow by 50 m of 2-nominal pipe, both schedule 40 commercial steel. the 1-nominal pipe contains 3 90° elbows (regular) anda fully open gate valve, all threaded. the pressure drop through the system is 150 kpa. determine the volume flow rate through the system that is horizontally laid.
Answers: 1
You know the right answer?
Things never seem to slow down, particularly on your existing subsea project. While all this activit...
Questions
question
Mathematics, 05.05.2020 13:34
question
Mathematics, 05.05.2020 13:34
question
History, 05.05.2020 13:34
question
History, 05.05.2020 13:34
Questions on the website: 13722363