subject
Engineering, 07.04.2020 20:11 angellong94

The following systems of periodic tasks are scheduled rate-monotonically on one processor. Determine whether each system is schedulable using a method that is fast and/or uses the least amount of information on the tasks. (a) T_1 = (2, 0.5, 4), T_2 = (3, 1.0, 10), T_1 = (5, 1.0, 10), and T_1 = (7, 0.45, 15).

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
You know the right answer?
The following systems of periodic tasks are scheduled rate-monotonically on one processor. Determine...
Questions
question
English, 11.03.2021 16:10
question
Mathematics, 11.03.2021 16:10
question
Mathematics, 11.03.2021 16:10
question
Spanish, 11.03.2021 16:10
question
Biology, 11.03.2021 16:10
Questions on the website: 13722363