The grade line is being developed for a six-lane freeway where a rising 2.5% grade meets a 1.5% falling grade at station 100 00. The elevation of the PVI of the two grades is 471.00 ft. a. Using a vertical curve length of 1400 ft, compute the middle ordinate of the equal-tangent vertical curve. b. Calculate elevations of the vertical curve for each station starting at the beginning of the curve (i. e., at stations 93+00, 94+00, etc.)

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Amass of m 1.5 kg of steam is contained in a closed rigid container. initially the pressure and temperature of the steam are: p 1.5 mpa and t 240°c (superheated state), respectively. then the temperature drops to t2= 100°c as the result of heat transfer to the surroundings. determine: a) quality of the steam at the end of the process, b) heat transfer with the surroundings. for: p1.5 mpa and t 240°c: enthalpy of superheated vapour is 2900 kj/kg, specific volume of superheated vapour is 0. 1483 m/kg, while for t 100°c: enthalpy of saturated liquid water is 419kj/kg, specific volume of saturated liquid water is 0.001043m/kg, enthalpy of saturated vapour is 2676 kj/kg, specific volume of saturated vapour is 1.672 m/kg and pressure is 0.1 mpa.
Answers: 3
question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
You know the right answer?
The grade line is being developed for a six-lane freeway where a rising 2.5% grade meets a 1.5% fall...
Questions
question
Mathematics, 05.05.2020 05:40
question
Mathematics, 05.05.2020 05:40
Questions on the website: 13722361