subject
Engineering, 07.04.2020 01:36 chloelandry

"Vehicles begin to arrive at a parking lot at 6:00 A. M. at a rate of eight per minute. Due to an accident on the access highway, no vehicles arrive from 6:20 to 6:30 A. M. From 6:30 A. M. on, vehicles arrive at a rate of two per minute. The parking-lot attendant processes incoming vehicles (collects parking fees) at a rate of four per minute throughout the day. Assuming D/D/1 queuing, determine total vehicle delay."

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
question
Engineering, 04.07.2019 19:10
What is the chief metrological difference between measuring with a microscope and with an electronic comparator? a. the microscope is limited to small workpieces.a. the microscope is limited to small workpieces. c. the comparator can only examine one point on the workpiece. d. the microscope carries its own standard.
Answers: 1
question
Engineering, 04.07.2019 19:10
Which of the following is the most important advantage of a large field of view? a. allows larger areas to be examined b. relieves eyestrain c. minimizes parallax errors. d. increases precision in proportion to the in- crease in field of view
Answers: 2
You know the right answer?
"Vehicles begin to arrive at a parking lot at 6:00 A. M. at a rate of eight per minute. Due to an ac...
Questions
question
Mathematics, 13.10.2020 14:01
question
Chemistry, 13.10.2020 14:01
Questions on the website: 13722363