subject
Engineering, 06.04.2020 22:15 dezmondpowell

In a mechanical assembly operation, the first work unit required 7.83 min to complete and the learning rate for mechanical assembly is 84% in the Crawford model. Using this learning curve model, determine the unit times to produce (a) the second unit, (b) the 10th unit, and (c) the 100th unit (d) the total cumulative time to produce units 1-100

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
You know the right answer?
In a mechanical assembly operation, the first work unit required 7.83 min to complete and the learni...
Questions
question
Mathematics, 03.12.2019 22:31
Questions on the website: 13722367