Engineering, 06.04.2020 18:11 Gladistshiala267
Vehicles arrive at a single toll booth beginning at 8:00 A. M. They arrive and depart according to a uniform deterministic distribution. However, the toll booth does not open until 8:10 A. M. The average arrival rate is 8 veh/min, and the average departure rate is 10 veh/min. Assuming D/D/1 queuing, when does the initial queue clear and what are the total delay, the average delay per vehicle, longest queue length (in vehicles), and the wait time of the 100th vehicle to arrive (assuming first-in-first-out)?
Answers: 2
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
Vehicles arrive at a single toll booth beginning at 8:00 A. M. They arrive and depart according to a...
History, 04.11.2020 18:30
Arts, 04.11.2020 18:30
Mathematics, 04.11.2020 18:30
Mathematics, 04.11.2020 18:30
Chemistry, 04.11.2020 18:30