subject
Engineering, 27.03.2020 03:25 bobthebattlebot

A slab milling operation is performed on the top surface of a steel rectangular workpiece 12.0 inlong by 2.5 in wide. The helical milling cutter, which has a 3.0 in diameter and ten teeth, is set upto overhang the width of the part on both sides. Cutting speed is 125 ft/min, feed is 0.006in/tooth, and depth of cut = 0.300 in. Determinea. the actual machining time to make one pass across the surface andb. the maximum metal removal rate during the cut. c. If an additional approach distance of 0.5 in is provided at the beginning of the pass (beforecutting begins), and an overtravel distance is provided at the end of the pass equal to thecutter radius plus 0.5 in, what is the duration of the feed motion.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Apipe with an outside diameter of 15 cm is exposed to an ambient air and surrounding temperature of -20°c. the pipe has an outer surface temperature of 65°c and an emissivity of 0.85. if the rate of heat loss from the pipe surface is 0.95 kw per meter of length, the external convective heat transfer coefficient (h) is: (a) 12.5 w/m"k (b) 18.6 w/mk (c) 23.7 w/mk (d) 27.9 w/mk (e) 33.5 w/mk
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 19:10
Air inially occupying a volume of 1 m2 at 100 kpa, 27 c undergoes three internally reversible processes in series. process 1-2 compression to 500 kpa during which pv constant process 2-3 adiabatic expanslon to 100 kpa process 3-1: constant-pressure expansion to 100 kpa (a) calculate the change of entropy for each of the three processes. (b) calculate the heat and work involved in each process. (c) is this cycle a power cycle or refrigeration cycle?
Answers: 3
You know the right answer?
A slab milling operation is performed on the top surface of a steel rectangular workpiece 12.0 inlon...
Questions
question
Mathematics, 28.09.2019 09:00
question
Mathematics, 28.09.2019 09:10
question
Mathematics, 28.09.2019 09:10
Questions on the website: 13722360