Develop a preliminary work breakdown structure (WBS) for a small one-story commercial building to be constructed on the site of an existing small-frame structure. It is 30 by 60 ft in plan (see illustration). The exterior and interior walls are of concrete block. The roof is constructed of bar joists covered with a steel roof deck, rigid insulation, and built-up roofing. The ceiling is pended acoustical tile. The floor is a concrete slab on grade with an asphalt tile finish. Interior finish on all walls is paint. a) Show the first level of this structure for the total project (WBS is developed from top to the bottom). b) Select one work package (or building system) of the first level and develop the second- level structure for this work package. Heat and mechanical Lavatory Storage

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
You know the right answer?
Develop a preliminary work breakdown structure (WBS) for a small one-story commercial building to be...
Questions
question
Business, 23.07.2020 22:01
question
Mathematics, 23.07.2020 22:01
question
Mathematics, 23.07.2020 22:01
question
Mathematics, 23.07.2020 22:01
question
Mathematics, 23.07.2020 22:01
Questions on the website: 13722367