Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. There has been a long-simmering dispute between the company’s estimator and the work supervisors. The on-site supervisors claim that the estimators do not adequately distinguish between routine work such as removal of asbestos insulation around heating pipes in older homes and nonroutine work such as removing asbestos-contaminated ceiling plaster in industrial buildings. The on-site supervisors believe that nonroutine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: "My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square footage by $2.80 to determine the bid price. Since our average cost is only $2.58 per square foot, that leaves enough cushion to take care of the additional costs of nonroutine work that shows up. Besides, it is difficult to know what is routine or not routine until you actually start tearing things apart."

To shed light on this controversy, the company initiated an activity-based costing study of all of its costs. Data from the activity-based costing system follow:

Activity Cost Pool Activity Measure Total Activity
Removing asbestos Thousands of square feet 850 thousand squarefeet
Estimating and job setup Number of jobs 400 jobs
Working on nonroutine jobs Number of nonroutine jobs 100 nonroutine jobs
Other (costs of idle capacity and
organization-sustaining costs) None

Note: The 100 nonroutine jobs are included in the total of 400 jobs. Both nonroutine jobs and routine jobs require estimating and setup.

Costs for the Year
Wages and salaries $ 400,000
Disposal fees 791,000
Equipment depreciation 96,000
On-site supplies 60,000
Office expenses 300,000
Licensing and insurance 500,000
Total cost $ 2,147,000

Distribution of Resource Consumption Across Activities

Removing Asbestos Estimating and Job Setup Working on Nonroutine Jobs Other Total
Wages and salaries 60 % 10 % 20 % 10 % 100 %
Disposal fees 60 % 0 % 40 % 0 % 100 %
Equipment depreciation 40 % 5 % 25 % 30 % 100 %
On-site supplies 60 % 25 % 15 % 0 % 100 %
Office expenses 10 % 35 % 25 % 30 % 100 %
Licensing and insurance 30 % 0 % 50 % 20 % 100 %

Required:

1. Perform the first-stage allocation of costs to the activity cost pools.

2. Compute the activity rates for the activity cost pools.

3. Using the activity rates you have computed, determine the total cost and the average cost per thousand square feet of each of the following jobs according to the activity-based costing system. (Round the "Average cost" to 2 decimal places.)

a. A routine 1,000-square-foot asbestos removal job.

Total cost of the job $
Average cost per thousand square feet $

b. A routine 2,000-square-foot asbestos removal job.

Total cost of the job $
Average cost per thousand square feet $

c. A nonroutine 2,000-square-foot asbestos removal job.

Total cost of the job $
Average cost per thousand square feet $

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
You know the right answer?
Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products f...
Questions
question
Biology, 27.01.2021 22:30
Questions on the website: 13722361