subject
Engineering, 13.03.2020 05:54 amandasantiago2001

1. Give an application where it will be necessary to step up a voltage using a transformer. 2. A power utility pole has a transformer with 2400 turns in the primary and 4.5KV coming from the power line. Describe the center-tapped secondary needed to obtain 240V (120V/120V) for a commercial customer.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 19:10
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
What is the chief metrological difference between measuring with a microscope and with an electronic comparator? a. the microscope is limited to small workpieces.a. the microscope is limited to small workpieces. c. the comparator can only examine one point on the workpiece. d. the microscope carries its own standard.
Answers: 1
You know the right answer?
1. Give an application where it will be necessary to step up a voltage using a transformer. 2. A po...
Questions
Questions on the website: 13722367