A highway reconstruction project involves a major realignment of thehighway such that a 60 mph design speed is attained. At one point on the highway, an 800 ft, equal-tangent, crest vertical curve exists. Measurements show that at 3+52 stations from the PVC, the vertical curve offset (tangent offset) is 3 ft.
1. Assess the adequacy of the existing curve in light of the reconstruction design speed of 60 mph.
2. If the existing curve is inadequate, compute a satisfactory curve length.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified ā€œxā€ tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
You know the right answer?
A highway reconstruction project involves a major realignment of thehighway such that a 60 mph desig...
Questions
question
Mathematics, 16.12.2020 16:40
question
Mathematics, 16.12.2020 16:50
Questions on the website: 13722367