A concrete dam 100 ft long is constructed on a stratum of sand-silt soil 10 ft thick and it is 6 ft below the soil surface. The hydraulic conductivity of the soil is 0.1 ft per day. Underlying the sand-silt soil an impermeable rock formation is present.
Considering the level of water in the upstream part of the dam is 45 ft above ground and downstream is at the same level of the ground, draw the flow net below the dam with three flow channels and 12 head drops and the flow rate in gal/day per unit foot of dam width (gal/day/ft).

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 19:20
Apreheater involves the use of condensing steam at 100°c on the inside of a bank of tubes to heat air that enters at 1 atm and 25°c. the air moves at 5 m/s in cross flow over the tubes. each tube is 1 m long and has an outside diameter of 10 mm. what is the minimum value of nl needed to achieve an outlet temperature of t 75 c? what is the corresponding pressure drop across the tube bank?
Answers: 3
question
Engineering, 06.07.2019 03:10
Asolid steel sphere (k=63.9 w m-1 k-1 , ? =7832 kg m-3 , c=0.523 kj kg-1 k-1 ), 100 mm in diameter is initially at a uniform temperature of 500o c and is suddenly quenched in a large oil bath for which t? = 100o c and h = 3200 w m-2 k-1. estimate the time required for the sphere to cool to 200o c and to 110o c
Answers: 1
You know the right answer?
A concrete dam 100 ft long is constructed on a stratum of sand-silt soil 10 ft thick and it is 6 ft...
Questions
question
Mathematics, 18.11.2020 20:00
question
English, 18.11.2020 20:00
question
Chemistry, 18.11.2020 20:00
Questions on the website: 13722363