subject
Engineering, 10.03.2020 00:56 iBrain

As a part of major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per 8-hour day. The task times and precedence relationships are as follows: Task Duration (minutes) Precedes Task A 0.2 B B 0.4 C C 0.2 F D 0.4 E E 1.2 G F 1.2 G G 1.0 end What is the idle time on station 2? (Assign tasks to workstations on the basis of greatest number of following tasks. Use longest processing time as a tiebreaker. If ties still exist, assume indifference in choice.)

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
You know the right answer?
As a part of major plant renovation project, the industrial engineering department has been asked to...
Questions
question
Social Studies, 29.01.2021 01:00
question
Mathematics, 29.01.2021 01:00
question
Spanish, 29.01.2021 01:00
question
Mathematics, 29.01.2021 01:00
question
Mathematics, 29.01.2021 01:00
Questions on the website: 13722363