The following data for the activities of a project are available: ACTIVITY IMMEDIATE PREDECESSOR DURATION (DAYS) A - 6 B - 4 C - 7 D A, B,C 5 E A, B,C 6 F D 9 G E 4 H F, G 8 I F, G 6 J H 7 Required: i. Draw the network, number the nodes, find the project completion time and calculate total, free and independent floats for the activities ii. When the activity duration of G is doubled, identify the critical path
Answers: 3
Engineering, 03.07.2019 15:10
Two flowing streams of argon gas are adiabatically mixed to form a single flow/stream. one stream is 1.5 kg/s at 400 kpa and 200 c while the second stream is 2kg/s at 500 kpa and 100 ? . it is stated that the exit state of the mixed single flow of argon gas is 150 c and 300 kpa. assuming there is no work output or input during the mixing process, does this process violate either the first or the second law or both? explain and state all your assumptions.
Answers: 1
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
The following data for the activities of a project are available: ACTIVITY IMMEDIATE PREDECESSOR DUR...
SAT, 14.07.2021 09:40
Mathematics, 14.07.2021 09:40
Business, 14.07.2021 09:40
English, 14.07.2021 09:40
Chemistry, 14.07.2021 09:40