subject
Engineering, 07.03.2020 04:44 holamigosss

A tile-iron consists of a massive plate maintained at 150 degrees Celsius by an embedded electrical heater. The iron is placed in contact with a tile to soften the adhesive allowing the tile to be easily lifted from the subflooring. The adhesive will soften sufficiently i heated above 50 degrees celsius for at least 2 minutes, but its temperature should not exceed 120 degrees Celsius. Assume the tile and subfloor to have an initial temperature of 25 degrees Celsius and to have equivalent thermophysical properties of k = .15 W/mK and (rho*c_p) = 1.5 * 10 ^ J/m^3K. a) How long will it take a worker using the tile-iron to lift a tile? Will the adhesive temperature exceed 120 degrees C?b) If the tile-iron has a square surface area 254mm to the side, how much energy has been removed from it during the time it has taken to lift the tile?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:20
Refrigerant-134a enters the compressor of a refrigerator as superheated vapor at 0.14 mpa and -10°c at a rate of 0.05 ka/s and leaves at 0.8 mpa and 50°c. the refrigerant is cooied in the condenser to 0.72 mpa and 26'c. it is then throttled to 0.15 mpa. sketch the t-s diagram for the system and evaluate: 6) the rate of heat removai from the refrigerated space (kw), it) the power input to the compressor (kw), ii) the isentropic efficiency of the compressor (%), and iv) the cop of the refrigerator.
Answers: 2
You know the right answer?
A tile-iron consists of a massive plate maintained at 150 degrees Celsius by an embedded electrical...
Questions
question
Social Studies, 15.12.2020 20:30
question
Mathematics, 15.12.2020 20:30
question
English, 15.12.2020 20:30
Questions on the website: 13722363