subject
Engineering, 06.03.2020 23:51 crtlq

You are given the following information about a drybatch paving operation. You are going to use one mixer that has a service rate of 30 services per hour. The dry-batch trucks you use for bringing concrete to the paver have an arrival rate of 7.5 arrivals per hour. Each truck carries 6 cubic yard of concrete. You have a total amount of 13,500 cubic yard of concrete to pour. You rent a truck at $15 per hour and the paver at $60 per hour. If the job takes more than 80 hours, you pay a penalty of $140 perhour owing todelays injob completion. Onthe basis of least cost, determine the number of trucks you should use. Plot the cost versus the number of trucks used.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 06.07.2019 03:20
Aparticle moves along a straight line such that its acceleration is a=(4t^2-2) m/s, where t is in seconds. when t = 0, the particle is located 2 m to the left of the origin, and when t = 2, it is 20 m to the left of the origin. determine the position of the particle when t=4s.
Answers: 1
question
Engineering, 06.07.2019 04:10
Water flows at the rate of 200 i/s upwards through a tapered vertical pipe. the diameter at marks(3) clo5) the bottom is 240 mm and at the top 200 mm and the length is 5m. the pressure at the bottom is 8 bar, and the pressure at the topside is 7.3 bar. determine the head loss through the pipe. express it as a function of exit velocity head.
Answers: 3
You know the right answer?
You are given the following information about a drybatch paving operation. You are going to use one...
Questions
question
Mathematics, 06.10.2019 00:10
question
Mathematics, 06.10.2019 00:10
question
Mathematics, 06.10.2019 00:10
question
English, 06.10.2019 00:10
Questions on the website: 13722361