A car collided with a telephone pole and left 20 ft skid marks on the dry pavement. Based on the damages sustained, an engineer estimated that the speed at collision was 15 mi/h. If the roadway had a 3% grade, calculate the speed of the car at the onset of skidding.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 06.07.2019 04:30
Calculate the resolved shear stress on the (111)[011] slip system of a unit cell in an fcc nickel single crystal if a stress of 13.7 mpa is applied in the [001] direction of a unit cell.
Answers: 1
You know the right answer?
A car collided with a telephone pole and left 20 ft skid marks on the dry pavement. Based on the dam...
Questions
question
Mathematics, 15.01.2020 01:31
Questions on the website: 13722363