A proposed grading plan requires 223,120 m3 of cut (excavation) and 206,670 m3 of fill. The excavated soil will be used as fill material. Laboratory tests on a series of undisturbed samples from the cut area produced an average dry unit weight of 17.0 kN/m3 and an average moisture content of 9.3%. A series of modified Proctor tests on representative bulk samples produced a maximum dry unit weight of 19.2 kN/m3 and an optimum moisture content of 10.2%. The project specifications require a relative compaction based on the modified Proctor test of at least 90%. a) Determine the shrinkage factor and compute the required volume of import or export, if any (the difference between the cut and fill volume; if the fill volume is larger than the cut volume, then the difference will have to be imported. Otherwise, the difference will have to be exported from the site). Use the dry unit weight of the cut when computing any import or export quantities. b) Determine the weight of any import or export soil, assuming it has a moisture content equal to the average moisture content in the cut. Express your answer in metric tons (1 metric ton

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
You know the right answer?
A proposed grading plan requires 223,120 m3 of cut (excavation) and 206,670 m3 of fill. The excavate...
Questions
question
Chemistry, 02.04.2020 02:51
question
Mathematics, 02.04.2020 02:51
question
Mathematics, 02.04.2020 02:51
question
English, 02.04.2020 02:51
question
Mathematics, 02.04.2020 02:51
Questions on the website: 13722362