subject
Engineering, 26.02.2020 00:21 gm2

You are working on a construction company that is interested in deriving quantitative estimates (e. g., positions, distances, and object heights) over a building site with dimensions of 200 m x 500 m. The company is using an Unmanned Aerial vehicle (UAV) equipped with a digital camera. What would be the pros/cons of using images from flying heights of 50 m versus 100 m to derive these measurements?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
You know the right answer?
You are working on a construction company that is interested in deriving quantitative estimates (e....
Questions
question
English, 31.01.2020 14:47
question
Mathematics, 31.01.2020 14:47
question
Mathematics, 31.01.2020 14:47
question
Mathematics, 31.01.2020 14:47
Questions on the website: 13722363