subject
Engineering, 25.02.2020 20:16 jsph5332

Cecilia’s Boutique wants several lists of salesperson data. Design a flowchart or pseudocode for the following: A program that accepts one sales person’s ID number, number of items sold in the last month, and total value of the items and displays data message only if the salesperson is a high performer-defined as a person who sells more than 200 items in the month.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 19:10
A)-in the process of engineering design, explain the contribution of material selection. b)- explain the procedure of synthesis as is employed in engineering design. c)- is there any relationship between ergonomics and engineering design? explain. d)- safety consideration in engineering design includes human, product and the enviroment . explain how safety will be incorporated into the design?
Answers: 3
You know the right answer?
Cecilia’s Boutique wants several lists of salesperson data. Design a flowchart or pseudocode for the...
Questions
question
Mathematics, 29.05.2020 22:59
Questions on the website: 13722359