subject
Engineering, 24.02.2020 19:32 jackandryansis8572

A highway reconstruction project is being undertaken to reduce crash rates. the reconstruction project involves a major realignment of the highway such that a 60mi/h design speed is attained. at one point on the highway, a 720 ft equal-tangent crest vertical curve exists. measurements show that at 3+40 stations from the PVC, the vertical curve offset is 3.5 ft. assess the adequacy of this existing curve in light of the reconstruction design speed of 60 mi/h and if the existing curve is inadequate, compute a satisfactory curve length.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 19:20
The power source in a certain welding setup generates 3500w that is transferred to the low carbon steel work with a heat transfer factor of 0.85. the melting factor in the operation is 0.45. a continuous fillet weld is to be made with a cross-sectional area of 23 mm2 determine the travel speed at which the welding can be accomplished.
Answers: 3
question
Engineering, 06.07.2019 03:20
Aload of 10kn is to be suddenly applied to the free end of a vertical rod of length 500 mm, the upper end being rigidly fixed. 190 mechanical science what should the diameter of the rod be if the maximum stress in the rod is not to exceed 100 mpa? the tensile modulus of the rod is 205 gpa.
Answers: 2
question
Engineering, 06.07.2019 04:10
Areheat rankine cycle operates with water as the working fluid. steam enters the first turbine at 8 mpa and 450°c and exits at 0.8 mpa. it is then reheated to 400°c before entering the second turbine, where it exits at 10 kpa. if the amount of work into the pump is 8.04 kj/kg and the net work per cycle produced is 1410.25 kj/kg, determine the thermal efficiency of the cycle.
Answers: 3
You know the right answer?
A highway reconstruction project is being undertaken to reduce crash rates. the reconstruction proje...
Questions
question
Mathematics, 20.07.2019 21:30
Questions on the website: 13722367