Assuming that the center of gravity is in the center of the bucket directly below the hook block, determine the following about the rigging system and hoist line used to lift a fully loaded concrete bucket.

a) The applied load in each chain

b) The tension in the hoist line

c) The rigging system that is most cost effective. Cost effectiveness is determined by the formula:

Price / Factor of Safety (FoS) where FoS = Rated Capacity/Applied Load

d) The maximum weight that can be lifted without failure of the 3-chain rigging system

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
question
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
question
Engineering, 04.07.2019 19:10
What is creep? what is stress relaxation?
Answers: 1
question
Engineering, 04.07.2019 19:10
An electric kettle is made out of stainless steel, weighs two pounds (when empty) and is equipped with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling
Answers: 2
You know the right answer?
Assuming that the center of gravity is in the center of the bucket directly below the hook block, de...
Questions
question
Mathematics, 25.11.2020 08:20
question
Mathematics, 25.11.2020 08:20
question
Mathematics, 25.11.2020 08:20
question
Chemistry, 25.11.2020 08:20
question
History, 25.11.2020 08:20
Questions on the website: 13722367