The contractor was awarded a contract to construct a parking lot for a small shopping center. the contractor plans to use single pusher scraper for site grading with a chain loading method.

it has been decided there will be total 11 scrapers, and for each scraper the estimated cycle time is 7 mins.

a) how many pushers are required to serve a fleet of 11 scrapers. b) the expected production of the scraper fleet if only 1 pusher is available. (production of a single scraper assuming adequate pusher support is 317 bcy/hr.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
You know the right answer?
The contractor was awarded a contract to construct a parking lot for a small shopping center. the co...
Questions
question
English, 02.02.2021 18:20
question
Mathematics, 02.02.2021 18:20
Questions on the website: 13722363