subject
Engineering, 17.12.2019 21:31 jaffeisabel

Why was the lack of preparedness of the federal emergency management agency in the hurricane katrina disaster so damaging for the george w. bush administration? a. president bush had vociferously denied that hurricanes of this size could ever reach the united states. b. the bush administration had prided itself on its unique focus for homeland security. c. there was nothing unusual about this particular hurricane, but the city and state had not done anything to prepare the city’s population. d. as a native of louisiana, he was expected to display particular care for new orleans. e. president bush had been the head of fema during his father’s presidency.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:10
A-mn has a cubic structure with a0 0.8931 nm and a density of 7.47 g/cm3. b-mn has a different cubic structure, with a0 0.6326 nm and a density of 7.26 g/cm3. the atomic weight of manganese is 54.938 g/mol and the atomic radius is 0.112 nm. determine the percent volume change that would occur if a-mn transforms to b-mn.
Answers: 2
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
You know the right answer?
Why was the lack of preparedness of the federal emergency management agency in the hurricane katrina...
Questions
question
Business, 21.07.2019 15:00
Questions on the website: 13722363