subject
Engineering, 03.12.2019 17:31 1lilzomb

4aerobic digesters (water depth = 15 ft) received waste from an mbr treatment plant. given conditions: q = 0.5 m. g.d., bod = 180 mg/l , soluble bod = 100 mg/l, t. s.s. = 200 mg/l, v. s.s. = 160 mg/l, mlss = 7000 mg/l, srt= 28 days, y= 0.8 and kd=0.04 (d-1 ). the target effluent soluble bod is zero. calculate the aeration basin volume, waste sludge, and volume of each aerobic digester required to meet class b requirements.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:20
Atank with constant volume contains 2.27 kg of a mixture of water phases (liquid-vapor). in the initial state the temperature and the quality are 127 °c and 0.6, respectively. the mixture is heated until the temperature of 160 oc is reached. illustrate the process in a t-v diagram. then, determine (1) the mass of the vapor in kg at the initial state, (2) the final pressure in kpa.
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
4aerobic digesters (water depth = 15 ft) received waste from an mbr treatment plant. given condition...
Questions
question
Mathematics, 15.01.2020 06:31
question
Mathematics, 15.01.2020 06:31
question
Mathematics, 15.01.2020 06:31
Questions on the website: 13722360