The project site will require clearing and grubbing prior to beginning earthwork operations. to select the appropriate dozer, the following should be considered: - there are both 335-hp and 460-hp dozers available - the site to be cleared is 75’ wide by 3/4 of a mile long. - the site is generally level and poses no traction problems for the equipment. - 60% of the trees are pines, 40% are oak - the total number of trees per acre is about 300; of those: - 140 trees per acre are 1 to 2 ft in diameter - 50 trees per acre are 2 to 3 ft in diameter. - 35 trees per acre are 3 to 4 ft in diameter. - the current plan is to clear and grub in one operation, and then follow with piling-up in windrows and burning. part 1 - identify which dozer, or combination of dozers, provides the best production rate.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
Starting wih an energy balance on a rectangular volume element, derive the one- dimensional transient heat conduction equation for a plane wall with constant thermal conductivity and no heat generation.
Answers: 1
You know the right answer?
The project site will require clearing and grubbing prior to beginning earthwork operations. to sele...
Questions
question
Mathematics, 13.05.2021 01:00
question
Business, 13.05.2021 01:00
question
Mathematics, 13.05.2021 01:00
question
Social Studies, 13.05.2021 01:00
Questions on the website: 13722367