subject
Engineering, 13.11.2019 23:31 lilbanks4

Jobs arrive to a two-station serial line at a rate of five jobs per hour with deterministic inter-arrival times. station 1 has one machine, which requires exactly 20 minutes to process a job. station 2 has one machine which requires exactly 15 minutes to process a job, provided it is up, but is subject to failures where the mean time to failure is 9 hours and the mean time to repair is one hour. a) what is the total cycle time at workstation 2 (assume no move batching between two stations)? b) assume we have move batching between two stations. in other words, the second workstation receives batches and puts out individual parts. what is the total cycle time of the system with a batch size k-5? c) how can we improve this system (i. e. how can we reduce ct and wip or increase th)? d) suppose we have moderate variability in workstation 1,le·v-c3 +cf)/2-1. what is the total cycle time in the system with a batch size k=5? e) show that ct increases proportionally with batch size (provide a plot) f) how can we improve this system with moderate variability in workstation 1?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
You know the right answer?
Jobs arrive to a two-station serial line at a rate of five jobs per hour with deterministic inter-ar...
Questions
question
Mathematics, 16.11.2020 17:00
question
Chemistry, 16.11.2020 17:00
Questions on the website: 13722363