subject
Engineering, 12.11.2019 07:31 joejoefofana

In a bid package given to a flooring sub, the gc accidently forgot to include a floor plan representing a few rooms totaling 2,500sf. the entire building is 550,000sf. the flooring subcontractor bid the project using the floorplans provided (missing 2,500sf) and signed a contract with the information received. if the scope of the contract states, "provide all flooring in new facility," is this contract enforceable by law? why or why not? 1.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
You know the right answer?
In a bid package given to a flooring sub, the gc accidently forgot to include a floor plan represent...
Questions
question
Physics, 23.04.2021 17:00
Questions on the website: 13722363