Engineering, 07.11.2019 02:31 jazare05

Find the following for an input of 120 vac(rms), 60 hertz, given a 10: 1 stepdown transformer, and a full-wave bridge rectifier. rload is 50 ohms. round off to the nearest tenths place. i. primary or input peak voltage ii. secondary peak voltage iii. peak voltage out of the rectifier iv. dc voltage out of the rectifier v. dc current into the load

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
question
Engineering, 04.07.2019 19:10
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
You know the right answer?
Find the following for an input of 120 vac(rms), 60 hertz, given a 10: 1 stepdown transformer, and a...