subject
Engineering, 05.11.2019 05:31 chunkymonkey090

Water is used to cool ethylene glycol in a 60-ft-long double pipe heat exchanger made of 4-std and 2-std (both type m) copper tubing. the water inlet temperature is 60°f and the ethylene glycol inlet temperature is 180°f. the flow rate of the ethylene glycol is 20 lb m/s, while that for the water is 30 lb m/s. calculate the expected outlet temperature of the ethylene glycol and determine the pressure drop expected for both streams. assume counterflow, and place the ethylene glycol in the inner tube. compose a summary of performance chart.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
question
Engineering, 04.07.2019 18:20
Atank with constant volume contains 2.27 kg of a mixture of water phases (liquid-vapor). in the initial state the temperature and the quality are 127 °c and 0.6, respectively. the mixture is heated until the temperature of 160 oc is reached. illustrate the process in a t-v diagram. then, determine (1) the mass of the vapor in kg at the initial state, (2) the final pressure in kpa.
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Water is used to cool ethylene glycol in a 60-ft-long double pipe heat exchanger made of 4-std and 2...
Questions
question
Mathematics, 06.02.2021 05:50
question
Mathematics, 06.02.2021 05:50
question
Mathematics, 06.02.2021 05:50
question
Mathematics, 06.02.2021 05:50
Questions on the website: 13722367