subject
Engineering, 29.10.2019 21:31 Anabel818

Acat d7g dozer is used in a push operation. the material (dry and non cohesive) weights 87 pcf in the bank state. it is estimated that the material will swell 5% from a bank state. the center of mass to center of mass pushing distance is 250 ft. job efficiency is estimated to be at a 50-min hour. the o& o cost for the dozer is $86 per hour and the operator's wage is $17.50 per hour plus 44% for fringes, insurance and worker's compensation. calculate the production in bcy per hour and the direct cost of the proposed earthmoving operation.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
You know the right answer?
Acat d7g dozer is used in a push operation. the material (dry and non cohesive) weights 87 pcf in th...
Questions
Questions on the website: 13722366