Apre-engineering baseline was run down a very steep hill. rather than measure horizontally downhill with the steel tape, the surveyor measures the vertical angle with a theodolite and the slope distance with a 200-ft steel tape. the vertical angle is -21° 26’ turned to a point on a plumbed range pole that is 4.88 ft above the ground. the slope distance from the theodolite to the point on the range pole is 148.61 ft. the theodolite’s optical center is 4.66 ft above the upper baseline station at 110 + 71.25. (a) if the elevation of the upper station is 318.71, what is the elevation of the lowerstation?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
You know the right answer?
Apre-engineering baseline was run down a very steep hill. rather than measure horizontally downhill...
Questions
question
Engineering, 02.04.2020 08:20
question
Mathematics, 02.04.2020 08:21
question
Mathematics, 02.04.2020 08:22
Questions on the website: 13722363